Capabilities

Every stage of production under one roof

Sinso has operated as Ningbo Sinso Printing Co., Ltd. since 1998. Our 15,000 sqm production floor in the Fenghua High-tech Development Zone runs prepress through binding without subcontracting any stage of the color-critical work.

Production stages

  1. 01 — Prepress. File preparation, color separation, and G7-calibrated digital proofing. RGB-native separations are generated here for ECG jobs; CMYK files are handled on parallel workflow.
  2. 02 — Printing. Heidelberg Speedmaster XL 75 in 8-color configuration. Inline color measurement on every run. G7 Master Printer-certified press operators sign off against the approved proof, not by eye.
  3. 03 — Coating. Aqueous, UV, soft-touch lamination, matte/gloss varnish, spot UV. Coatings can be applied inline on the XL 75 or off-line for finishes that require curing.
  4. 04 — Die-cutting. Folding cartons, set-up boxes, display units, blister card backers. Tooling produced in-house; sample dies turn within the 7–10 day proof window.
  5. 05 — Binding and assembly. Gluing, foil stamping, embossing/debossing, magnetic-closure rigid box assembly, window patching, and final QC against the approved sample.

Press and finishing

Primary pressHeidelberg Speedmaster XL 75, 8-color, with inline coater
Color workflow7-color ECG (CMYK + Orange, Green, Violet) and conventional CMYK both supported
SubstratesSBS, FBB, kraft, recycled board, specialty coated stocks
FinishingSpot UV, soft-touch, hot-foil stamping, embossing/debossing, window patching
Box constructionFolding cartons, rigid set-up boxes, magnetic-closure gift boxes, blister backers, display units

Certifications

G7 Master PrinterColor calibration and proof-to-press conformance (Idealliance)
GMIPackaging supplier certification for Target, Walmart, Home Depot, Best Buy, Lowe's, Academy Sports, and Walgreens vendor programs
ISO 9001:2015Quality management system certification
FSC Chain of CustodyCertified responsible sourcing and chain of custody for paper substrates

Project flow

Stage Typical timing What you receive
Brief and sampling7–10 daysPhysical sample, airshipped
Color proofDuring samplingG7-calibrated digital proof for approval
ProductionPer project quoteFull press run with inline color measurement
DeliveryPer project quoteFOB Ningbo standard; DDP available on request

What we don't do

Have a spec sheet ready: hello@sinso.us. We respond within 24 hours.